Well, the first week of the new regime has been a success! Go ME!
The first step was to finish section 6 of Line Dried. DONE!
Here it is attached to the end of the second row but i still need to sew row 1 and 2 together.
Lots of mini ditzy prints in this one. But some solids and larger prints balance them out.
My leader ender project was to finish another 3 Giant Granny Squares. DONE!
And so onto the next step. Quilting some more of There's a Square in There. Just a recap... I'm halfway through quilting the background sections... I have already finished the blocks. I last worked on this one in May.
The quilt is a 4 x 4 layout... 16 blocks... 8 blocks sashing left to quilt. To finish by the end of the year I decided I needed to quilt around 2 blocks per month.
So my mini goal in the great To do list is to quilt around one block. It's all begins with that first step.... a quick clean, a new bobbin, thread the right colour thread (thank you past me for recording the right thread colour on my In the Works list), do a test swatch then change to a new needle... then finally a couple sections of stitching.
Once this section is finished I'm going to have a mini break and do something different before coming back to tackle the second block.
3 comments:
I like the idea of breaking that quilting job into manageable. I am sure it will make for a neater finish in the end!
Love your quilting design for the background filler!
Oh, boy, Suz! I absolutely love both of these quilt projects. That filler is amazing, though I imagine it takes a long time to do! Makes for a great so-much-per-month project. *Love* the fabric mix in your Line Dry project.
Post a Comment